Date of establishment: 2010
Capacity:
10 000 per year
Products:
LED Product Manufacturing
The company was established in 2011 and is located in the Astana SEZ, benefiting from preferential conditions (zero corporate income tax, property tax, VAT on imports, and no customs duties on imported components). The land area is 3 hectares, and a greenhouse of 0.64 hectares with LED lighting is being commissioned. Infrastructure facilities include office and warehouse premises, access to a railway branch, and engineering and telecommunication networks. Equipment includes a cleanroom for filament production and an automated line for filament lamp manufacturing with a capacity of 16,000 units per shift, as well as LED production equipment with a capacity of 12 million units.