Date of establishment: 2019

Capacity:

338 000 tons per year 

Products:

LINTEC CSD 2500

沥青混合料、改性沥青混合料和彩色沥青混合料生产厂

The Lintec CSD 2500 asphalt concrete plant (Lintec, Germany) is one of the world leaders in containerized asphalt plants. The produced mixtures ensure the construction of high-quality pavement layers, providing longlasting, maintenance-free operation and enhancing road safety. The product range includes hot asphalt mixtures for upper and lower layers, black gravel, and stone mastic asphalt.

The plant’s production capacity reaches 90,000–100,000 tons per year. Production is carried out on modern technological lines equipped with the latest equipment and automation systems.

The plant is equipped with a laboratory that monitors and controls the entire production process. 

Astana Metiz Project

Contact phone: +7 (7172) 312-214
Address: Astana, Industrial Park, 194 A Street, Building 3

Back to the list